Assessment Year | 1996 |
---|---|
Principal Product | gray and ductile iron castings |
NAICS |
n/a
|
SIC | 3792: Travel Trailers and Campers |
Sales Range | $10 M to 50M |
# of Employees | 135 |
Plant Area |
n/a
|
Annual Production | 3,500
ton
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $34,126 | 961,606 |
kWh
|
$0.035 |
Electricity Demand | $13,306 | 336 |
kW-mo/yr
|
$39.60 |
Natural Gas | $41,946 | 10,055 |
MMBtu
|
$4.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $52,238 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $38,321 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.8314: Purchase high materials in returnable bulk containers | $35,724 | $13,720 | - | - | - | $6,558 | $29,166 | |
02 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $11,084 | $1,500 | - | - | - | - | $11,084 | |
03 | 2.1133: Adjust burners for efficient operation | $1,648 | $1,000 | - | - |
$1,648
-
MMBtu
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,101 | $374 |
$686
19,637
kWh
|
$415
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $729 | $1,020 |
$197
5,569
kWh
|
$26
-
kW-mo/yr
|
- | $506 | - | |
06 | 2.7135: Install occupancy sensors | $658 | $800 |
$421
12,016
kWh
|
$237
-
kW-mo/yr
|
- | - | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $527 | $446 |
$327
9,379
kWh
|
$200
-
kW-mo/yr
|
- | - | - | |
08 | 2.4314: Use synthetic lubricant | $471 | $585 |
$249
7,034
kWh
|
$151
-
kW-mo/yr
|
- | - | $71 | |
09 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $296 | $1,155 |
$487
14,068
kWh
|
$51
-
kW-mo/yr
|
$(-242.0)
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $52,238 | $20,600 |
$2,367
67,703
kWh
|
$1,080
-
kW-mo/yr
|
$1,406
-
MMBtu
|
$7,064 | $40,321 | ||
TOTAL IMPLEMENTED | $38,321 | $16,854 |
$1,619
46,308
kWh
|
$643
-
kW-mo/yr
|
$(-242.0)
-
MMBtu
|
$7,064 | $29,237 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs