ITAC Assessment: OK0427
ITAC logo
ITAC Assessment: OK0427
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Cottonseed oil
NAICS
n/a
SIC 2079: Shortening, Table Oils, Margarine, and Other Edible Fats and Oils, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 71
Plant Area 1,742,400
ft2
Annual Production 52,822,059
lb
Production Hrs. Annual 6,430
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $889,941 19,687,867
kWh
Natural Gas $297,614 153,458
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,421 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,852

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $9,670 $5,000 - $9,670
-
MMBtu
02 2.4133: Use most efficient type of electric motors $18,819 $49,834 $18,819
418,230
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $13,033 $34,476 $13,033
289,566
kWh
-
04 2.2441: Preheat boiler makeup water with waste process heat $11,717 $1,000 - $11,717
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $182 $193 - $182
-
MMBtu
TOTAL RECOMMENDED $53,421 $90,503 $31,852
707,796
kWh
$21,569
-
MMBtu
TOTAL IMPLEMENTED $9,852 $5,193 - $9,852
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs