Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,933

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Primary metal manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0936 #04 Y:2019 Utilize higher efficiency lamps and/or ballasts $35,634 $19,362
GT0936 #03 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $16,073 $3,500
GT0936 #02 Y:2019 Apply for tax-free status for energy purchases $17,484 $2,000
GT0936 #01 Y:2019 Install occupancy sensors $24,628 $2,456
AM0789 #06 Y:2019 Reduce the pressure of compressed air to the minimum required $1,900 $1,620
AM0789 #05 Y:2019 Make a practice of turning off lights when not needed $3,600 -
AM0789 #04 Y:2019 Install skylights $4,290 $7,120
AM0789 #03 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $7,100 $2,000
AM0789 #02 Y:2019 Optimize plant power factor $15,300 $53,500
AM0789 #01 Y:2019 Utilize higher efficiency lamps and/or ballasts $28,740 $46,480
UA0216 #07 Y:2019 Reduce the pressure of compressed air to the minimum required $10,010 $50
UA0216 #06 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $25,527 $8,775
UA0216 #05 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $7,592 $9,552
UA0216 #04 Y:2019 Use most efficient type of electric motors $55,565 $163,736
UA0216 #03 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $67,295 $83,671
UA0216 #02 Y:2019 Re-size charging openings or add a movable door on equipment $3,963 $927
UA0216 #01 Y:2019 Convert to oxyfuel burners $683,991 $1,000,000
LS1912 #07 Y:2019 Utilize energy-efficient belts and other improved mechanisms $515 $1,198
LS1912 #06 Y:2019 Reduce the pressure of compressed air to the minimum required $1,657 $2,850
LS1912 #05 Y:2019 Utilize higher efficiency lamps and/or ballasts $42,700 $46,200