ITAC Assessment: UA0216
ITAC logo
ITAC Assessment: UA0216
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Steel rebar
NAICS 331110: Iron and Steel Mills and Ferroalloy Manufacturing
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $100
M
to 500
M
# of Employees 260
Plant Area 1,000,000
ft2
Annual Production 876,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $11,925,323 282,941,787
kWh
Natural Gas $3,218,058 792,625
MMBtu
TOTAL YEARLY COSTS $15,143,381
RECOMMENDED SAVINGS* $853,943 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.1125: Convert to oxyfuel burners $683,991 $1,000,000 - $698,390
-
MMBtu
$(-14,399.0)
02 2.1122: Re-size charging openings or add a movable door on equipment $3,963 $927 - $3,963
-
MMBtu
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $67,295 $83,671 $67,295
1,569,566
kWh
- -
04 2.4133: Use most efficient type of electric motors $55,565 $163,736 $55,565
1,318,278
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,592 $9,552 $7,592
180,106
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $25,527 $8,775 $25,527
605,626
kWh
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $10,010 $50 $10,010
237,491
kWh
- -
TOTAL RECOMMENDED $853,943 $1,266,711 $165,989
3,911,067
kWh
$702,353
-
MMBtu
$(-14,399.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs