ITAC Assessment: WI0183
ITAC logo
ITAC Assessment: WI0183
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Hardboard
NAICS
n/a
SIC 2493: Reconstituted Wood Products
Sales Range $1
M
to 5
M
# of Employees 32
Plant Area 34,485
ft2
Annual Production 0
units
Production Hrs. Annual 4,250
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,818 399,179
kWh
Natural Gas $9,568 2,257
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,124 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,197

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,073 $40,000 - $2,073
-
MMBtu
02 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $2,157 $750 $2,157
22,274
kWh
-
03 2.8113: Purchase gas directly from a contract gas supplier $3,359 $500 - $3,359
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $812 - $812
4,982
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $474 $350 $474
4,103
kWh
-
06 2.3133: Consider three or four days around-the-clock operation rather than one or two shifts per day $385 $600 $385
-
kWh
-
07 2.2437: Recover waste heat from equipment $373 $640 - $373
-
MMBtu
08 2.4221: Install compressor air intakes in coolest locations $296 $848 $296
2,931
kWh
-
09 2.7447: Install vinyl strip / high speed / air curtain doors $195 - - $195
-
MMBtu
TOTAL RECOMMENDED $10,124 $43,688 $4,124
34,290
kWh
$6,000
-
MMBtu
TOTAL IMPLEMENTED $1,197 $600 $1,197
4,982
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs