Assessment Year | 1993 |
---|---|
Principal Product | Hardboard |
NAICS |
n/a
|
SIC | 2493: Reconstituted Wood Products |
Sales Range | $1 M to 5M |
# of Employees | 32 |
Plant Area |
34,485
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $38,818 | 399,179 |
kWh
|
$0.097 |
Natural Gas | $9,568 | 2,257 |
MMBtu
|
$4.24 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,124 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,197 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,073 | $40,000 | - |
$2,073
-
MMBtu
|
|
02 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $2,157 | $750 |
$2,157
22,274
kWh
|
- | |
03 | 2.8113: Purchase gas directly from a contract gas supplier | $3,359 | $500 | - |
$3,359
-
MMBtu
|
|
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $812 | - |
$812
4,982
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $474 | $350 |
$474
4,103
kWh
|
- | |
06 | 2.3133: Consider three or four days around-the-clock operation rather than one or two shifts per day | $385 | $600 |
$385
-
kWh
|
- | |
07 | 2.2437: Recover waste heat from equipment | $373 | $640 | - |
$373
-
MMBtu
|
|
08 | 2.4221: Install compressor air intakes in coolest locations | $296 | $848 |
$296
2,931
kWh
|
- | |
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $195 | - | - |
$195
-
MMBtu
|
|
TOTAL RECOMMENDED | $10,124 | $43,688 |
$4,124
34,290
kWh
|
$6,000
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,197 | $600 |
$1,197
4,982
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs