ITAC Assessment: UM0409
ITAC logo
ITAC Assessment: UM0409
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Laundry
NAICS 812332: Industrial Launderers
SIC 7218: Industrial Launderers
Sales Range $5
M
to 10
M
# of Employees 87
Plant Area 23,000
ft2
Annual Production 13,000,000
lb
Production Hrs. Annual 5,148
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,549 816,640
kWh
Natural Gas $143,750 31,250
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,924 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $1,058 $1,200 $1,058
18,562
kWh
-
02 2.2414: Use waste heat from hot flue gases to preheat $7,590 $10,000 - $7,590
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $7,300 $5,000 - $7,300
-
MMBtu
04 2.2511: Insulate bare equipment $4,324 $3,000 - $4,324
-
MMBtu
05 2.2414: Use waste heat from hot flue gases to preheat $2,652 $6,000 - $2,652
-
MMBtu
TOTAL RECOMMENDED $22,924 $25,200 $1,058
18,562
kWh
$21,866
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs