ITAC Assessment: OR0427
ITAC logo
ITAC Assessment: OR0427
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Particle Board
NAICS 321212: Softwood Veneer and Plywood Manufacturing
SIC 2436: Softwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 118
Plant Area
n/a
Annual Production 93,249,000
thousand feet
Production Hrs. Annual 0
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $847,834 24,349,942
kWh
Electricity Demand $153,966 45,024
kW-mo/yr
Electricity Fees $41,200 -
Natural Gas $564,896 128,003
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $134,680 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,326

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $31,750 $81,000 $28,030
804,983
kWh
$3,720
-
kW-mo/yr
-
02 4.444: Install system to collect scrap $31,504 $40,100 n/a $(-312.0)
(-8,970)
kWh
$(-84.0)
-
kW-mo/yr
$31,900
03 2.5125: Size air handling grills/ duct/s coils to minimize air resistance $15,700 $55,400 $13,500
387,000
kWh
$2,200
-
kW-mo/yr
-
04 2.4322: Use or replace with energy efficient substitutes $1,046 $4,680 $968
27,800
kWh
$78
-
kW-mo/yr
-
05 2.4133: Use most efficient type of electric motors $40,300 $87,300 $35,500
1,020,000
kWh
$4,800
-
kW-mo/yr
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $13,400 $24,600 $11,800
338,000
kWh
$1,600
-
kW-mo/yr
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $980 - $860
24,750
kWh
$120
-
kW-mo/yr
-
TOTAL RECOMMENDED $134,680 $293,080 $90,346
2,593,563
kWh
$12,434
-
kW-mo/yr
$31,900
TOTAL IMPLEMENTED $42,326 $91,980 $37,328
1,072,550
kWh
$4,998
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs