ITAC Assessment: OD0095
ITAC logo
ITAC Assessment: OD0095
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Signs
NAICS
n/a
SIC 3993: Signs and Advertising Specialties
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 35,000
ft2
Annual Production 3,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,355 598,183
kWh
Electricity Demand $10,999 1,893
kW-mo/yr
Electricity Fees $1,561 -
Natural Gas $11,735 1,600
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,194 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,962 $8,508 $2,727
55,686
kWh
$1,235
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $171 $289 $171
3,517
kWh
- - -
03 2.2437: Recover waste heat from equipment $1,935 $2,025 - - $1,935
-
MMBtu
-
04 3.5315: Lease / purchase baler; sell cardboard to recycler $2,126 - - - - $2,126
-
lb
TOTAL RECOMMENDED $8,194 $10,822 $2,898
59,203
kWh
$1,235
-
kW-mo/yr
$1,935
-
MMBtu
$2,126
-
lb
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs