ITAC Assessment: AM0789
ITAC logo
ITAC Assessment: AM0789
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Butt weld pipe fittings
NAICS 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $10
M
to 50
M
# of Employees 67
Plant Area 93,648
ft2
Annual Production 4,000
pieces
Production Hrs. Annual 4,560
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,746 3,196,984
kWh
Electricity Demand $80,577 20,695
kW-mo/yr
Electricity Fees $6,952 -
Natural Gas $218,043 52,802
MMBtu
TOTAL YEARLY COSTS $445,318
RECOMMENDED SAVINGS* $60,930 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,640

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $28,740 $46,480 $20,300
461,800
kWh
$9,000
-
kW-mo/yr
$(-560.0)
02 2.3212: Optimize plant power factor $15,300 $53,500 - $15,300
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,100 $2,000 $5,000
114,000
kWh
$2,100
-
kW-mo/yr
-
04 2.7145: Install skylights $4,290 $7,120 $4,290
97,500
kWh
- -
05 2.7124: Make a practice of turning off lights when not needed $3,600 - $3,600
82,200
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,900 $1,620 $1,900
43,500
kWh
- -
TOTAL RECOMMENDED $60,930 $110,720 $35,090
799,000
kWh
$26,400
-
kW-mo/yr
$(-560.0)
TOTAL IMPLEMENTED $56,640 $103,600 $30,800
701,500
kWh
$26,400
-
kW-mo/yr
$(-560.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs