Assessment Year | 2019 |
---|---|
Principal Product | Butt weld pipe fittings |
NAICS | 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel |
SIC | 3498: Fabricated Pipe and Pipe Fittings |
Sales Range | $10 M to 50M |
# of Employees | 67 |
Plant Area |
93,648
ft2
|
Annual Production | 4,000
pieces
|
Production Hrs. Annual | 4,560
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $139,746 | 3,196,984 |
kWh
|
$0.044 |
Electricity Demand | $80,577 | 20,695 |
kW-mo/yr
|
$3.89 |
Electricity Fees | $6,952 | - |
|
- |
Natural Gas | $218,043 | 52,802 |
MMBtu
|
$4.13 |
TOTAL YEARLY COSTS | $445,318 | |||
RECOMMENDED SAVINGS* | $60,930 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $56,640 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $28,740 | $46,480 |
$20,300
461,800
kWh
|
$9,000
-
kW-mo/yr
|
$(-560.0) | |
02 | 2.3212: Optimize plant power factor | $15,300 | $53,500 | - |
$15,300
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,100 | $2,000 |
$5,000
114,000
kWh
|
$2,100
-
kW-mo/yr
|
- | |
04 | 2.7145: Install skylights | $4,290 | $7,120 |
$4,290
97,500
kWh
|
- | - | |
05 | 2.7124: Make a practice of turning off lights when not needed | $3,600 | - |
$3,600
82,200
kWh
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,900 | $1,620 |
$1,900
43,500
kWh
|
- | - | |
TOTAL RECOMMENDED | $60,930 | $110,720 |
$35,090
799,000
kWh
|
$26,400
-
kW-mo/yr
|
$(-560.0) | ||
TOTAL IMPLEMENTED | $56,640 | $103,600 |
$30,800
701,500
kWh
|
$26,400
-
kW-mo/yr
|
$(-560.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs