ITAC Assessment: UF0355
ITAC logo
ITAC Assessment: UF0355
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product cement
NAICS 327310: Cement Manufacturing
SIC 3241: Cement, Hydraulic
Sales Range $50
M
to 100
M
# of Employees 115
Plant Area 250,000
ft2
Annual Production 1,300,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,356,505 28,149,217
kWh
Coal $624,564 205,450
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,898 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,112

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Coal Savings Solid Waste (haz) Savings
01 2.6231: Utilize controls to operate equipment only when needed $14,486 $80,890 $14,486
301,712
kWh
- -
02 2.4226: Use / purchase optimum sized compressor $21,072 $93,200 $21,072
407,424
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,438 $478 $3,438
71,616
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $23,786 - $23,786
495,540
kWh
- -
05 2.4133: Use most efficient type of electric motors $5,000 $23,755 $5,000
104,160
kWh
- -
06 4.515: Install shelves / racks to utilize unused space $12,491 $50,000 - $12,491
-
MMBtu
-
07 3.5318: Recycle fluorescent lamps $625 $3,496 - - $625
-
lb
TOTAL RECOMMENDED $80,898 $251,819 $67,782
1,380,452
kWh
$12,491
-
MMBtu
$625
-
lb
TOTAL IMPLEMENTED $57,112 $251,819 $43,996
884,912
kWh
$12,491
-
MMBtu
$625
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Coal Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs