Assessment Year | 2019 |
---|---|
Principal Product | Architectural Products |
NAICS | 331313: Alumina Refining and Primary Aluminum Production |
SIC | 3334: Primary Production of Aluminum |
Sales Range | $100 M to 500M |
# of Employees | 104 |
Plant Area |
142,814
ft2
|
Annual Production | 31,200
thousand feet
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $548,937 | 6,073,987 |
kWh
|
$0.090 |
Natural Gas | $93,123 | 13,396 |
MMBtu
|
$6.95 |
LPG | $89,128 | 1,513 |
MMBtu
|
$58.91 |
TOTAL YEARLY COSTS | $731,188 | |||
RECOMMENDED SAVINGS* | $220,482 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $102,940 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $24,628 | $2,456 |
$24,628
273,649
kWh
|
- | - | - | - | |
02 | 2.8121: Apply for tax-free status for energy purchases | $17,484 | $2,000 | - | $17,484 | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $16,073 | $3,500 |
$16,073
178,589
kWh
|
- | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $35,634 | $19,362 |
$35,634
395,934
kWh
|
- | - | - | - | |
05 | 2.4235: Remove or close off unneeded compressed air lines | $1,489 | $1,020 |
$1,489
16,539
kWh
|
- | - | - | - | |
06 | 2.4235: Remove or close off unneeded compressed air lines | $19,169 | $14,400 |
$19,169
212,984
kWh
|
- | - | - | - | |
07 | 2.1331: Burn a less expensive grade of fuel | $9,120 | $9,016 | - | - |
$(-1,676.0)
-
MMBtu
|
$10,796
-
MMBtu
|
- | |
08 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $96,885 | $235,465 |
$179,136
1,990,402
kWh
|
- |
$(-58,748.4)
-
MMBtu
|
- | $(-23,503.0) | |
TOTAL RECOMMENDED | $220,482 | $287,218 |
$276,129
3,068,097
kWh
|
$17,484 |
$(-60,424.4)
-
MMBtu
|
$10,796
-
MMBtu
|
$(-23,503.0) | ||
TOTAL IMPLEMENTED | $102,940 | $36,334 |
$76,335
848,172
kWh
|
$17,484 |
$(-1,676.0)
-
MMBtu
|
$10,796
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs