Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Architectural Products
NAICS 331313: Alumina Refining and Primary Aluminum Production
SIC 3334: Primary Production of Aluminum
Sales Range $100
M
to 500
M
# of Employees 104
Plant Area 142,814
ft2
Annual Production 31,200
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $548,937 6,073,987
kWh
Natural Gas $93,123 13,396
MMBtu
LPG $89,128 1,513
MMBtu
TOTAL YEARLY COSTS $731,188
RECOMMENDED SAVINGS* $220,482 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $102,940

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings LPG Savings Personnel Changes Savings
01 2.7135: Install occupancy sensors $24,628 $2,456 $24,628
273,649
kWh
- - - -
02 2.8121: Apply for tax-free status for energy purchases $17,484 $2,000 - $17,484 - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,073 $3,500 $16,073
178,589
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $35,634 $19,362 $35,634
395,934
kWh
- - - -
05 2.4235: Remove or close off unneeded compressed air lines $1,489 $1,020 $1,489
16,539
kWh
- - - -
06 2.4235: Remove or close off unneeded compressed air lines $19,169 $14,400 $19,169
212,984
kWh
- - - -
07 2.1331: Burn a less expensive grade of fuel $9,120 $9,016 - - $(-1,676.0)
-
MMBtu
$10,796
-
MMBtu
-
08 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $96,885 $235,465 $179,136
1,990,402
kWh
- $(-58,748.4)
-
MMBtu
- $(-23,503.0)
TOTAL RECOMMENDED $220,482 $287,218 $276,129
3,068,097
kWh
$17,484 $(-60,424.4)
-
MMBtu
$10,796
-
MMBtu
$(-23,503.0)
TOTAL IMPLEMENTED $102,940 $36,334 $76,335
848,172
kWh
$17,484 $(-1,676.0)
-
MMBtu
$10,796
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings LPG Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs