Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

85

matching recommendations
$
$
ARC 2+ Digits Required
NAICS All other miscellaneous nonmetallic mineral product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CW0116 #07 Y:2020 Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $438 -
CW0116 #06 Y:2020 Install soft-start to eliminate nuisance trips $3,657 $2,615
CW0116 #05 Y:2020 Insulate glazing, walls, ceilings, and roofs $4,030 $19,360
CW0116 #04 Y:2020 Reduce the pressure of compressed air to the minimum required $46 -
CW0116 #03 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $138 $90
CW0116 #02 Y:2020 Use or replace with energy efficient substitutes $752 $70
CW0116 #01 Y:2020 Install compressor air intakes in coolest locations $342 $1,350
SF0544 #05 Y:2019 Use solar heat to make electricty $249,622 $1,187,556
SF0544 #04 Y:2019 Utilize energy-efficient belts and other improved mechanisms $2,820 $9,188
SF0544 #03 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $4,026 $11,278
SF0544 #02 Y:2019 Minimize overflows by installing level controls $1,610 $2,208
SF0544 #01 Y:2019 Turn off equipment when not in use $920 -
SD0519 #06 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $3,572 $1,500
SD0519 #05 Y:2015 Install timers and/or thermostats $3,856 $210
SD0519 #04 Y:2015 Replace existing hvac unit with high efficiency model $3,983 $16,500
SD0519 #03 Y:2015 Clean or color roof to reduce solar load $4,091 $8,805
SD0519 #02 Y:2015 Use power during off-peak periods $15,251 $10,325
SD0519 #01 Y:2015 Upgrade controls on compressors $15,876 $6,475
MA0714 #08 Y:2013 Turn off steam / hot water lines leading to space heating units $1,360 $150
MA0714 #07 Y:2013 Optimize plant power factor $11,188 $13,500