Assessment Year | 2015 |
---|---|
Principal Product | Stucco And Cement |
NAICS | 327999: All Other Miscellaneous Nonmetallic Mineral Product Manufacturing |
SIC | 3299: Nonmetallic Mineral Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
265,680
ft2
|
Annual Production | 1,000,000
units
|
Production Hrs. Annual | 3,250
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $93,136 | 1,001,800 |
kWh
|
$0.093 |
Electricity Demand | $35,911 | 5,430 |
kW-mo/yr
|
$6.61 |
Electricity Fees | $22,250 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $46,629 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $42,538 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.4224: Upgrade controls on compressors | $15,876 | $6,475 |
$12,806
137,703
kWh
|
$3,070
-
kW-mo/yr
|
- | |
02 | 2.3137: Use power during off-peak periods | $15,251 | $10,325 | - | - | $15,251 | |
03 | 2.7425: Clean or color roof to reduce solar load | $4,091 | $8,805 |
$3,730
40,121
kWh
|
$361
-
kW-mo/yr
|
- | |
04 | 2.7232: Replace existing hvac unit with high efficiency model | $3,983 | $16,500 |
$3,281
35,286
kWh
|
$702
-
kW-mo/yr
|
- | |
05 | 2.7261: Install timers and/or thermostats | $3,856 | $210 |
$3,250
34,974
kWh
|
$606
-
kW-mo/yr
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,572 | $1,500 |
$3,342
35,939
kWh
|
$230
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $46,629 | $43,815 |
$26,409
284,023
kWh
|
$4,969
-
kW-mo/yr
|
$15,251 | ||
TOTAL IMPLEMENTED | $42,538 | $35,010 |
$22,679
243,902
kWh
|
$4,608
-
kW-mo/yr
|
$15,251 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs