Assessment Year | 2018 |
---|---|
Principal Product | Aggregate, Ready-Mix Concrete, Asphalt |
NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
SIC | 3273: Ready-Mixed Concrete |
Sales Range | $10 M to 50M |
# of Employees | 30 |
Plant Area |
680,000
ft2
|
Annual Production | 412,707
units
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $49,070 | 769,000 |
kWh
|
$0.064 |
Electricity Demand | $20,288 | 3,204 |
kW-mo/yr
|
$6.33 |
Electricity Fees | $6,000 | - |
|
- |
Natural Gas | $403,481 | 72,616 |
MMBtu
|
$5.56 |
TOTAL YEARLY COSTS | $478,839 | |||
RECOMMENDED SAVINGS* | $249,427 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,608 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #1 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.231: Purchase equipment instead of leasing | $219,819 | $375,000 | - | - | - |
$(-18,181.0)
-
MMBtu
|
$238,000 | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,959 | $10,959 |
$9,203
144,221
kWh
|
$756
-
kW-mo/yr
|
- | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,594 | $4,336 |
$7,794
122,147
kWh
|
$800
-
kW-mo/yr
|
- | - | - | |
04 | 2.4224: Upgrade controls on compressors | $7,018 | $26,371 |
$5,828
91,337
kWh
|
$1,190
-
kW-mo/yr
|
- | - | - | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,108 | $5,028 |
$3,773
59,130
kWh
|
$909
-
kW-mo/yr
|
$(-1,574.0)
-
MMBtu
|
- | - | |
06 | 2.1113: Reduce combustion air flow to optimum | $929 | - | - | - |
$1,929
-
MMBtu
|
- | $(-1,000.0) | |
TOTAL RECOMMENDED | $249,427 | $421,694 |
$26,598
416,835
kWh
|
$3,655
-
kW-mo/yr
|
$355
-
MMBtu
|
$(-18,181.0)
-
MMBtu
|
$237,000 | ||
TOTAL IMPLEMENTED | $29,608 | $46,694 |
$26,598
416,835
kWh
|
$3,655
-
kW-mo/yr
|
$355
-
MMBtu
|
- | $(-1,000.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #1 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs