ITAC Assessment: OR0713
ITAC logo
ITAC Assessment: OR0713
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Aggregate, Ready-Mix Concrete, Asphalt
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 3273: Ready-Mixed Concrete
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 680,000
ft2
Annual Production 412,707
units
Production Hrs. Annual 3,120
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,070 769,000
kWh
Electricity Demand $20,288 3,204
kW-mo/yr
Electricity Fees $6,000 -
Natural Gas $403,481 72,616
MMBtu
TOTAL YEARLY COSTS $478,839
RECOMMENDED SAVINGS* $249,427 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,608

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #1 Savings Administrative Changes Savings
01 4.231: Purchase equipment instead of leasing $219,819 $375,000 - - - $(-18,181.0)
-
MMBtu
$238,000
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,959 $10,959 $9,203
144,221
kWh
$756
-
kW-mo/yr
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $8,594 $4,336 $7,794
122,147
kWh
$800
-
kW-mo/yr
- - -
04 2.4224: Upgrade controls on compressors $7,018 $26,371 $5,828
91,337
kWh
$1,190
-
kW-mo/yr
- - -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,108 $5,028 $3,773
59,130
kWh
$909
-
kW-mo/yr
$(-1,574.0)
-
MMBtu
- -
06 2.1113: Reduce combustion air flow to optimum $929 - - - $1,929
-
MMBtu
- $(-1,000.0)
TOTAL RECOMMENDED $249,427 $421,694 $26,598
416,835
kWh
$3,655
-
kW-mo/yr
$355
-
MMBtu
$(-18,181.0)
-
MMBtu
$237,000
TOTAL IMPLEMENTED $29,608 $46,694 $26,598
416,835
kWh
$3,655
-
kW-mo/yr
$355
-
MMBtu
- $(-1,000.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #1 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs