ITAC Assessment: SF0544
ITAC logo
ITAC Assessment: SF0544
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Crushed Aggregates
NAICS 327999: All Other Miscellaneous Nonmetallic Mineral Product Manufacturing
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $1
M
to 5
M
# of Employees 14
Plant Area 400,000
ft2
Annual Production 1,000,000
ton
Production Hrs. Annual 2,600
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $205,754 1,650,714
kWh
Electricity Demand $300,192 10,286
kW-mo/yr
Electricity Fees $481 -
TOTAL YEARLY COSTS $506,427
RECOMMENDED SAVINGS* $258,998 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $254,972

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6218: Turn off equipment when not in use $920 - $920
7,365
kWh
-
02 3.7222: Minimize overflows by installing level controls $1,610 $2,208 $775
6,199
kWh
$835
-
kW-mo/yr
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,026 $11,278 $1,832
14,663
kWh
$2,194
-
kW-mo/yr
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,820 $9,188 $1,316
10,537
kWh
$1,504
-
kW-mo/yr
05 2.9114: Use solar heat to make electricty $249,622 $1,187,556 $180,667
1,446,026
kWh
$68,955
-
kW-mo/yr
TOTAL RECOMMENDED $258,998 $1,210,230 $185,510
1,484,790
kWh
$73,488
-
kW-mo/yr
TOTAL IMPLEMENTED $254,972 $1,198,952 $183,678
1,470,127
kWh
$71,294
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs