ITAC Assessment: SF0597
ITAC logo
ITAC Assessment: SF0597
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Energetic Aerospace Devices
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 180,000
ft2
Annual Production 7,500
units
Production Hrs. Annual 5,228
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $322,289 2,693,065
kWh
Electricity Demand $231,630 7,419
kW-mo/yr
LPG $101,295 3,428
MMBtu
TOTAL YEARLY COSTS $655,214
RECOMMENDED SAVINGS* $392,408 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $391,702

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,268 - - $4,268
-
kW-mo/yr
-
02 2.7131: Add area lighting switches $11,388 $100 $11,388
95,139
kWh
- -
03 2.7224: Reduce space conditioning during non-working hours $53,882 $13,192 $12,350
103,174
kWh
- $41,532
-
MMBtu
04 2.4239: Eliminate or reduce compressed air usage $706 $200 $474
3,960
kWh
$232
-
kW-mo/yr
-
05 2.9114: Use solar heat to make electricty $322,164 $2,251,041 $322,164
2,691,431
kWh
- -
TOTAL RECOMMENDED $392,408 $2,264,533 $346,376
2,893,704
kWh
$4,500
-
kW-mo/yr
$41,532
-
MMBtu
TOTAL IMPLEMENTED $391,702 $2,264,333 $345,902
2,889,744
kWh
$4,268
-
kW-mo/yr
$41,532
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs