Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

90

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Ground or treated mineral and earth manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0312 #05 Y:2026 Replace fossil fuel equipment with electrical equipment $30,000 $139,500
UU0312 #04 Y:2026 Level zero – install control systems for existing equipment $157,000 $650,000
UU0312 #03 Y:2026 Re-use or recycle hot or cold process exhaust air $12,500 $41,270
UU0312 #02 Y:2026 Insulate bare equipment $11,840 $7,940
UU0312 #01 Y:2026 Modify process to reduce material use/cost $7,200 $4,635
UU0311 #06 Y:2026 Adjust / maintain fork lift trucks for most efficient operation $11,150 $93,000
UU0311 #05 Y:2026 Insulate bare equipment $1,230 $2,350
UU0311 #04 Y:2026 Reduce or eliminate waste $3,600 $4,640
UU0311 #03 Y:2026 Use waste heat from hot flue gases to preheat $13,900 $41,300
UU0311 #02 Y:2026 Use / purchase optimum sized compressor $9,400 $40,200
UU0311 #01 Y:2026 Install system to collect scrap $279,000 $750,000
UU0310 #04 Y:2026 Reduce the pressure of compressed air to the minimum required $350 $800
UU0310 #03 Y:2026 Recover waste heat from equipment $850 $3,540
UU0310 #02 Y:2026 Use solar heat to make electricty $15,980 $200,000
UU0310 #01 Y:2026 Install sensors to detect defects $192,988 $1,006,000
GT1008 #05 Y:2026 Use solar heat to make electricty $747,721 $6,224,188
GT1008 #04 Y:2026 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $1,225,825 $6,037,500
GT1008 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $8,235 $28,000
GT1008 #02 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $17,753 $35,000
GT1008 #01 Y:2026 Utilize energy-efficient belts and other improved mechanisms $3,187 $2,888