ITAC Assessment: GT0927
ITAC logo
ITAC Assessment: GT0927
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Fire Retardant Additives
NAICS 327992: Ground or Treated Mineral and Earth Manufacturing
SIC 3295: Minerals and Earths, Ground or Otherwise Treated
Sales Range $50
M
to 100
M
# of Employees 85
Plant Area 144,000
ft2
Annual Production 123,426
ton
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,590,231 27,821,968
kWh
Natural Gas $544,739 132,533
MMBtu
TOTAL YEARLY COSTS $2,134,970
RECOMMENDED SAVINGS* $451,707 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $81,198

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $32,534 $4,145 $32,534
570,765
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,930 $2,500 $7,930
139,131
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $35,382 $27,983 $35,382
620,734
kWh
-
04 2.2511: Insulate bare equipment $5,352 $6,398 - $5,352
-
MMBtu
05 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $308,141 $1,725,000 $456,000
8,000,000
kWh
$(-147,859.3)
-
MMBtu
06 2.9114: Use solar heat to make electricty $62,369 $548,847 $62,369
1,091,187
kWh
-
TOTAL RECOMMENDED $451,707 $2,314,873 $594,215
10,421,817
kWh
$(-142,507.7)
-
MMBtu
TOTAL IMPLEMENTED $81,198 $41,026 $75,846
1,330,630
kWh
$5,352
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs