Assessment Year | 2019 |
---|---|
Principal Product | Fire Retardant Additives |
NAICS | 327992: Ground or Treated Mineral and Earth Manufacturing |
SIC | 3295: Minerals and Earths, Ground or Otherwise Treated |
Sales Range | $50 M to 100M |
# of Employees | 85 |
Plant Area |
144,000
ft2
|
Annual Production | 123,426
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,590,231 | 27,821,968 |
kWh
|
$0.057 |
Natural Gas | $544,739 | 132,533 |
MMBtu
|
$4.11 |
TOTAL YEARLY COSTS | $2,134,970 | |||
RECOMMENDED SAVINGS* | $451,707 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $81,198 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $32,534 | $4,145 |
$32,534
570,765
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,930 | $2,500 |
$7,930
139,131
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $35,382 | $27,983 |
$35,382
620,734
kWh
|
- | |
04 | 2.2511: Insulate bare equipment | $5,352 | $6,398 | - |
$5,352
-
MMBtu
|
|
05 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $308,141 | $1,725,000 |
$456,000
8,000,000
kWh
|
$(-147,859.3)
-
MMBtu
|
|
06 | 2.9114: Use solar heat to make electricty | $62,369 | $548,847 |
$62,369
1,091,187
kWh
|
- | |
TOTAL RECOMMENDED | $451,707 | $2,314,873 |
$594,215
10,421,817
kWh
|
$(-142,507.7)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $81,198 | $41,026 |
$75,846
1,330,630
kWh
|
$5,352
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs