Assessment Year | 2003 |
---|---|
Principal Product | Kiln Dried Lumber |
NAICS | 321912: Cut Stock, Resawing Lumber, and Planing |
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $5 M to 10M |
# of Employees | 14 |
Plant Area |
61,170
ft2
|
Annual Production | 5,000
thousand feet
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $28,376 | 511,200 |
kWh
|
$0.056 |
Electricity Fees | $(-900.0) | - |
|
- |
Natural Gas | $168,580 | 26,875 |
MMBtu
|
$6.27 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $42,131 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,665 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $22,034 | $1,640 | - |
$22,034
-
MMBtu
|
- | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $7,198 | $1,000 | - |
$7,198
-
MMBtu
|
- | |
03 | 3.7311: Maintain machines to reduce leaks | $5,774 | $35 | - |
$5,774
-
MMBtu
|
- | |
04 | 2.2511: Insulate bare equipment | $3,173 | $252 | - |
$3,173
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,432 | $2,093 |
$1,432
26,638
kWh
|
- | - | |
06 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $1,068 | $435 |
$1,242
23,147
kWh
|
- | $(-174.0) | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $772 | $2,925 |
$772
14,357
kWh
|
- | - | |
08 | 2.7111: Reduce illumination to minimum necessary levels | $654 | $73 |
$654
12,155
kWh
|
- | - | |
09 | 2.6212: Turn off equipment during breaks, reduce operating time | $26 | - |
$26
491
kWh
|
- | - | |
TOTAL RECOMMENDED | $42,131 | $8,453 |
$4,126
76,788
kWh
|
$38,179
-
MMBtu
|
$(-174.0) | ||
TOTAL IMPLEMENTED | $18,665 | $4,720 |
$2,694
50,150
kWh
|
$16,145
-
MMBtu
|
$(-174.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs