ITAC Assessment: WV0274
ITAC logo
ITAC Assessment: WV0274
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Kiln Dried Lumber
NAICS 321912: Cut Stock, Resawing Lumber, and Planing
SIC 2421: Sawmills and Planing Mills, General
Sales Range $5
M
to 10
M
# of Employees 14
Plant Area 61,170
ft2
Annual Production 5,000
thousand feet
Production Hrs. Annual 2,125
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,376 511,200
kWh
Electricity Fees $(-900.0) -
Natural Gas $168,580 26,875
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,131 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,665

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $22,034 $1,640 - $22,034
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $7,198 $1,000 - $7,198
-
MMBtu
-
03 3.7311: Maintain machines to reduce leaks $5,774 $35 - $5,774
-
MMBtu
-
04 2.2511: Insulate bare equipment $3,173 $252 - $3,173
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,432 $2,093 $1,432
26,638
kWh
- -
06 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $1,068 $435 $1,242
23,147
kWh
- $(-174.0)
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $772 $2,925 $772
14,357
kWh
- -
08 2.7111: Reduce illumination to minimum necessary levels $654 $73 $654
12,155
kWh
- -
09 2.6212: Turn off equipment during breaks, reduce operating time $26 - $26
491
kWh
- -
TOTAL RECOMMENDED $42,131 $8,453 $4,126
76,788
kWh
$38,179
-
MMBtu
$(-174.0)
TOTAL IMPLEMENTED $18,665 $4,720 $2,694
50,150
kWh
$16,145
-
MMBtu
$(-174.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs