Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Aluminum Galvanized Steel
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 150
Plant Area 350,000
ft2
Annual Production 700,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,332,048 51,629,778
kWh
Electricity Demand $1,476,294 105,418
kW-mo/yr
Electricity Fees $142,403 -
Natural Gas $2,340,877 694,518
MMBtu
TOTAL YEARLY COSTS $5,291,622
RECOMMENDED SAVINGS* $220,901 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $76,908

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.2437: Recover waste heat from equipment $46,415 $81,000 $26,465
1,025,772
kWh
$19,950
-
kW-mo/yr
- -
02 2.4224: Upgrade controls on compressors $41,175 $63,410 $23,101
895,412
kWh
$18,074
-
kW-mo/yr
- -
03 2.2414: Use waste heat from hot flue gases to preheat $31,971 $11,460 $(-105.0)
(-4,072)
kWh
- $32,076
-
MMBtu
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $25,562 $534 $14,642
567,507
kWh
$10,920
-
kW-mo/yr
- -
05 2.4157: Establish a predictive maintenance program $20,481 $1,000 $15,677
607,649
kWh
$11,648
-
kW-mo/yr
- $(-6,844.0)
06 2.4151: Develop a repair/replace policy $14,226 $1,514 $8,329
322,814
kWh
$6,188
-
kW-mo/yr
- $(-291.0)
07 2.7142: Utilize higher efficiency lamps and/or ballasts $12,611 $45,435 $7,011
271,753
kWh
$5,600
-
kW-mo/yr
- -
08 2.1321: Replace fossil fuel equipment with electrical equipment $11,821 $43,746 $(-24,870.0)
(-963,970)
kWh
$(-18,746.0)
-
kW-mo/yr
$55,437
-
MMBtu
-
09 2.1233: Analyze flue gas for proper air/fuel ratio $10,727 $3,024 - - $10,727
-
MMBtu
-
10 2.2511: Insulate bare equipment $5,912 $2,928 - - $5,912
-
MMBtu
-
TOTAL RECOMMENDED $220,901 $254,051 $70,250
2,722,865
kWh
$53,634
-
kW-mo/yr
$104,152
-
MMBtu
$(-7,135.0)
TOTAL IMPLEMENTED $76,908 $9,000 $38,648
1,497,970
kWh
$28,756
-
kW-mo/yr
$16,639
-
MMBtu
$(-7,135.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs