79
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | Concrete pipe manufacturing | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
AM0794 #07 Y:2019 | 07 | 2019 | Pay utility bills on time | $127 | - | |
AM0794 #06 Y:2019 | 06 | 2019 | Reduce the pressure of compressed air to the minimum required | $670 | $7 | |
AM0794 #05 Y:2019 | 05 | 2019 | Use synthetic lubricant | $801 | $100 | |
AM0794 #04 Y:2019 | 04 | 2019 | Reduce the pressure of compressed air to the minimum required | $990 | $450 | |
AM0794 #03 Y:2019 | 03 | 2019 | Make a practice of turning off lights when not needed | $1,100 | $8 | |
AM0794 #02 Y:2019 | 02 | 2019 | Apply for tax-free status for energy purchases | $12,250 | $2,000 | |
AM0794 #01 Y:2019 | 01 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,215 | $2,000 | |
BS0086 #05 Y:2016 | 05 | 2016 | Install compressor air intakes in coolest locations | $1,268 | $147 | |
BS0086 #04 Y:2016 | 04 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,877 | $1,280 | |
BS0086 #03 Y:2016 | 03 | 2016 | Utilize controls to operate equipment only when needed | $2,887 | $280 | |
BS0086 #02 Y:2016 | 02 | 2016 | Replace boiler | $4,643 | $61,724 | |
BS0086 #01 Y:2016 | 01 | 2016 | Optimize plant power factor | $12,315 | $14,270 | |
MI0144 #05 Y:2006 | 05 | 2006 | Reduce the pressure of compressed air to the minimum required | $4,578 | $30 | |
MI0144 #04 Y:2006 | 04 | 2006 | Reduce illumination to minimum necessary levels | $7,878 | $135 | |
MI0144 #03 Y:2006 | 03 | 2006 | Replace fossil fuel equipment with electrical equipment | $8,832 | $6,430 | |
MI0144 #02 Y:2006 | 02 | 2006 | Utilize higher efficiency lamps and/or ballasts | $9,559 | $22,932 | |
MI0144 #01 Y:2006 | 01 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $18,115 | $1,074 | |
CO0594 #10 Y:2006 | 10 | 2006 | Install / repair insulation on steam lines | $360 | $90 | |
CO0594 #09 Y:2006 | 09 | 2006 | Apply for tax-free status for energy purchases | $950 | $500 | |
CO0594 #08 Y:2006 | 08 | 2006 | Utilize higher efficiency lamps and/or ballasts | $990 | $3,420 |