*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product concrete utility poles
NAICS 327332: Concrete Pipe Manufacturing
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $10
M
to 50
M
# of Employees 84
Plant Area 117,000
ft2
Annual Production 4,500
pieces
Production Hrs. Annual 4,350
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,031 1,042,944
kWh
Electricity Demand $25,173 7,799
kW-mo/yr
Electricity Fees $5,084 -
Natural Gas $41,773 6,213
MMBtu
TOTAL YEARLY COSTS $158,061
RECOMMENDED SAVINGS* $21,153 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,483

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,215 $2,000 $4,270
62,700
kWh
$945
-
kW-mo/yr
- -
02 2.8121: Apply for tax-free status for energy purchases $12,250 $2,000 - - $2,450 $9,800
03 2.7124: Make a practice of turning off lights when not needed $1,100 $8 $1,100
16,000
kWh
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $990 $450 $990
14,550
kWh
- - -
05 2.4314: Use synthetic lubricant $801 $100 $328
4,810
kWh
$473
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $670 $7 $480
7,000
kWh
$190
-
kW-mo/yr
- -
07 2.8123: Pay utility bills on time $127 - - - $127 -
TOTAL RECOMMENDED $21,153 $4,565 $7,168
105,060
kWh
$1,608
-
kW-mo/yr
$2,577 $9,800
TOTAL IMPLEMENTED $20,483 $4,558 $6,688
98,060
kWh
$1,418
-
kW-mo/yr
$2,577 $9,800
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs