Assessment Year | 2007 |
---|---|
Principal Product | Concrete Piping |
NAICS | 327332: Concrete Pipe Manufacturing |
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $5 M to 10M |
# of Employees | 85 |
Plant Area |
1,000,000
ft2
|
Annual Production | 350,000
ton
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $206,361 | 2,134,000 |
kWh
|
$0.097 |
Electricity Demand | $45,863 | 5,740 |
kW-mo/yr
|
$7.99 |
Electricity Fees | $22,174 | - |
|
- |
Natural Gas | $41,556 | 39,265 |
MMBtu
|
$1.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,962 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $18,115 | $1,074 |
$13,946
185,422
kWh
|
$4,169
-
kW-mo/yr
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,559 | $22,932 |
$7,884
104,832
kWh
|
$1,675
-
kW-mo/yr
|
|
03 | 2.1321: Replace fossil fuel equipment with electrical equipment | $8,832 | $6,430 |
$8,832
147,971
kWh
|
- | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $7,878 | $135 |
$6,498
86,400
kWh
|
$1,380
-
kW-mo/yr
|
|
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,578 | $30 |
$3,948
52,493
kWh
|
$630
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $48,962 | $30,601 |
$41,108
577,118
kWh
|
$7,854
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs