| Assessment Year | 2007 |
|---|---|
| Principal Product | Concrete Piping |
| NAICS | 327332: Concrete Pipe Manufacturing |
| SIC | 3272: Concrete Products, Except Block and Brick |
| Sales Range | $5 M to 10M |
| # of Employees | 85 |
| Plant Area |
1,000,000
ft2
|
| Annual Production | 350,000
ton
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $206,361 | 2,134,000 |
kWh
|
$0.097 |
| Electricity Demand | $45,863 | 5,740 |
kW-mo/yr
|
$7.99 |
| Electricity Fees | $22,174 | - |
|
- |
| Natural Gas | $41,556 | 39,265 |
MMBtu
|
$1.06 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $48,962 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $18,115 | $1,074 |
$13,946
185,422
kWh
|
$4,169
-
kW-mo/yr
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,559 | $22,932 |
$7,884
104,832
kWh
|
$1,675
-
kW-mo/yr
|
|
| 03 | 2.1321: Replace fossil fuel equipment with electrical equipment | $8,832 | $6,430 |
$8,832
147,971
kWh
|
- | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $7,878 | $135 |
$6,498
86,400
kWh
|
$1,380
-
kW-mo/yr
|
|
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,578 | $30 |
$3,948
52,493
kWh
|
$630
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $48,962 | $30,601 |
$41,108
577,118
kWh
|
$7,854
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs