ITAC Assessment: MI0144
ITAC logo
ITAC Assessment: MI0144
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Concrete Piping
NAICS 327332: Concrete Pipe Manufacturing
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area 1,000,000
ft2
Annual Production 350,000
ton
Production Hrs. Annual 6,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $206,361 2,134,000
kWh
Electricity Demand $45,863 5,740
kW-mo/yr
Electricity Fees $22,174 -
Natural Gas $41,556 39,265
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,962 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,115 $1,074 $13,946
185,422
kWh
$4,169
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,559 $22,932 $7,884
104,832
kWh
$1,675
-
kW-mo/yr
03 2.1321: Replace fossil fuel equipment with electrical equipment $8,832 $6,430 $8,832
147,971
kWh
-
04 2.7111: Reduce illumination to minimum necessary levels $7,878 $135 $6,498
86,400
kWh
$1,380
-
kW-mo/yr
05 2.4231: Reduce the pressure of compressed air to the minimum required $4,578 $30 $3,948
52,493
kWh
$630
-
kW-mo/yr
TOTAL RECOMMENDED $48,962 $30,601 $41,108
577,118
kWh
$7,854
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs