ITAC Assessment: MS0199
ITAC logo
ITAC Assessment: MS0199
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Fabricated steel structures
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 167
Plant Area 70,000
ft2
Annual Production 12,000
ton
Production Hrs. Annual 5,993
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $128,255 2,618,992
kWh
Electricity Demand $20,956 7,635
kW-mo/yr
Electricity Fees $24,085 -
Natural Gas $76,122 7,778
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $518,210 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,385

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Primary Product Savings
01 2.2437: Recover waste heat from equipment $7,110 $3,070 - - - $7,110
-
MMBtu
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,645 $437 $6,319
132,474
kWh
- $2,326 - - -
03 2.7261: Install timers and/or thermostats $740 $827 $541
11,430
kWh
- $199 - - -
04 2.4221: Install compressor air intakes in coolest locations $534 $242 $357
7,620
kWh
$44
-
kW-mo/yr
$133 - - -
05 3.6124: Burn waste oil for heat $1,181 $409 - - - $851
-
MMBtu
$330
-
gal
-
06 4.511: Expand operations into unused space $500,000 $1,000,000 - - - - - $500,000
TOTAL RECOMMENDED $518,210 $1,004,985 $7,217
151,524
kWh
$44
-
kW-mo/yr
$2,658 $7,961
-
MMBtu
$330
-
gal
$500,000
TOTAL IMPLEMENTED $9,385 $1,264 $6,860
143,904
kWh
- $2,525 - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs