ITAC Assessment: GT0940
ITAC logo
ITAC Assessment: GT0940
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Fire Protection, Water, and Wastewater Pumps
NAICS 333911: Pump and Pumping Equipment Manufacturing
SIC 3561: Pumps and Pumping Equipment
Sales Range $100
M
to 500
M
# of Employees 291
Plant Area 190,000
ft2
Annual Production 5,211
units
Production Hrs. Annual 5,148
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $431,824 4,890,095
kWh
Natural Gas $145,461 12,808
MMBtu
TOTAL YEARLY COSTS $577,285
RECOMMENDED SAVINGS* $127,527 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,838

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $3,860 $300 $3,860
43,861
kWh
02 2.2625: Chill water to the highest temperature possible $956 $250 $956
10,862
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,480 $3,500 $4,480
50,914
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,602 $1,267 $1,602
18,201
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $32,838 $36,630 $32,838
373,158
kWh
06 2.9114: Use solar heat to make electricty $83,791 $569,779 $83,791
949,068
kWh
TOTAL RECOMMENDED $127,527 $611,725 $127,527
1,446,064
kWh
TOTAL IMPLEMENTED $32,838 $36,630 $32,838
373,158
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs