166
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UU0286 #05 Y:2025 | 05 | 2025 | Utilize higher efficiency lamps and/or ballasts | $2,200 | $15,740 |
n/a
|
UU0286 #04 Y:2025 | 04 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,270 | $1,800 |
n/a
|
UU0286 #03 Y:2025 | 03 | 2025 | Replace fossil fuel equipment with electrical equipment | $18,569 | $141,050 |
n/a
|
UU0286 #02 Y:2025 | 02 | 2025 | Utilize controls to operate equipment only when needed | $59,940 | $100,340 |
n/a
|
UU0286 #01 Y:2025 | 01 | 2025 | Increase efficiency of trucks | $126,055 | $584,355 |
n/a
|
SD0680 #07 Y:2025 | 07 | 2025 | Use insulation in furnaces to facilitate heating / cooling | $3,261 | $2,066 |
n/a
|
SD0680 #06 Y:2025 | 06 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $13,594 | $7,158 |
n/a
|
SD0680 #05 Y:2025 | 05 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $25 | $85 |
n/a
|
SD0680 #04 Y:2025 | 04 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $938 | $1,623 |
n/a
|
SD0680 #03 Y:2025 | 03 | 2025 | Use most efficient type of electric motors | $68,636 | $26,246 |
n/a
|
SD0680 #02 Y:2025 | 02 | 2025 | Use battery storage for demand control | $314,069 | $13,401 |
n/a
|
SD0680 #01 Y:2025 | 01 | 2025 | Use solar heat to make electricty | $24,191 | $55,932 |
n/a
|
LE0570 #06 Y:2024 | 06 | 2024 | Install back-up equipment | $46,731 | $90,000 | |
LE0570 #05 Y:2024 | 05 | 2024 | Install compressor air intakes in coolest locations | $4,252 | $5,000 | |
LE0570 #04 Y:2024 | 04 | 2024 | Reduce the pressure of compressed air to the minimum required | $25,168 | $26,500 | |
LE0570 #03 Y:2024 | 03 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $55,246 | $42,000 | |
LE0570 #02 Y:2024 | 02 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $33,515 | $15,000 | |
LE0570 #01 Y:2024 | 01 | 2024 | Reschedule plant operations or reduce load to avoid peaks | $9,292 | - | |
UW2317 #05 Y:2023 | 05 | 2023 | Improve combustion control capability | $30,104 | $300,000 | |
UW2317 #04 Y:2023 | 04 | 2023 | Change product design to reduce energy requirements | $31,756 | $1,000,000 |