Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Glass product manufacturing made of purchased glass
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MU0095 #08 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,302 $1,530
MU0095 #07 Y:2026 Install occupancy sensors $322 $1,128
MU0095 #06 Y:2026 Use photocell controls $88 $124
MU0095 #05 Y:2026 Reduce illumination to minimum necessary levels $258 -
MU0095 #04 Y:2026 Turn off equipment when not in use $32 -
MU0095 #03 Y:2026 Reduce the pressure of compressed air to the minimum required $12,746 -
MU0095 #02 Y:2026 Use solar heat to make electricty $66,138 $1,100,000
MU0095 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $64,082 $76,821
IP0217 #04 Y:2025 Install occupancy sensors $10,073 $3,780
IP0217 #03 Y:2025 Reduce space conditioning during non-working hours $18,398 -
IP0217 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $46,665 -
IP0217 #01 Y:2025 Use computer programs to optimize hvac performance $49,158 -
IP0174 #06 Y:2023 Replace existing hvac unit with high efficiency model $28,594 $78,000
IP0174 #05 Y:2023 Utilize higher efficiency lamps and/or ballasts $80,518 $123,235
IP0174 #04 Y:2023 Utilize higher efficiency lamps and/or ballasts $12,006 $2,730
IP0174 #03 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $76,877 $14,812
IP0174 #02 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $19,401 $1,048
IP0174 #01 Y:2023 Turn off equipment when not in use $42,275 -
IP0144 #06 Y:2021 Utilize higher efficiency lamps and/or ballasts $11,442 $22,030
IP0144 #05 Y:2021 Install occupancy sensors $194 $195