Assessment Year | 2023 |
---|---|
Principal Product | Automotive Glass |
NAICS | 327215: Glass Product Manufacturing Made of Purchased Glass |
SIC | 3231: Glass Products, Made of Purchased Glass |
Sales Range | $100 M to 500M |
# of Employees | 330 |
Plant Area |
430,000
ft2
|
Annual Production | 2,440,000
pieces
|
Production Hrs. Annual | 7,572
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $4,230,514 | 69,890,400 |
kWh
|
$0.061 | |
Electricity Demand | $1,358,605 | 138,601 |
kW-mo/yr
|
$9.80 | |
Electricity Fees | $2,787 | - |
|
- | |
Natural Gas | $177,674 | 15,311 |
MMBtu
|
$11.60 | |
Waste Disposal Costs | |||||
Water Usage | $252,496 | 28,404 |
Tgal
|
$8.89 | |
TOTAL YEARLY COSTS | $6,022,076 | ||||
RECOMMENDED SAVINGS* | $259,671 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $231,077 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $42,275 | - |
$23,852
391,023
kWh
|
$18,423
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $19,401 | $1,048 |
$15,461
253,456
kWh
|
$3,940
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $76,877 | $14,812 |
$76,877
1,260,279
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,006 | $2,730 |
$12,006
196,827
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $80,518 | $123,235 |
$64,265
1,053,525
kWh
|
$16,253
-
kW-mo/yr
|
- | |
06 | 2.7232: Replace existing hvac unit with high efficiency model | $28,594 | $78,000 | - | - |
$28,594
-
MMBtu
|
|
TOTAL RECOMMENDED | $259,671 | $219,825 |
$192,461
3,155,110
kWh
|
$38,616
-
kW-mo/yr
|
$28,594
-
MMBtu
|
||
TOTAL IMPLEMENTED | $231,077 | $141,825 |
$192,461
3,155,110
kWh
|
$38,616
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs