ITAC Assessment: TN0680
ITAC logo
ITAC Assessment: TN0680
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Hardwood Flooring
NAICS
n/a
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 300,000
ft2
Annual Production 15,000
thousand feet
Production Hrs. Annual 4,000
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $149,725 4,422,919
kWh
Electricity Demand $75,158 12,526
kW-mo/yr
Electricity Fees $9,373 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $154,858 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,310

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 2.1331: Burn a less expensive grade of fuel $75,400 $400,000 - - - $75,400 -
02 4.421: Modify current incentive program $37,500 $16,430 - - - - $37,500
03 2.4151: Develop a repair/replace policy $30,832 $1,075 $3,832
61,254
kWh
- - - $27,000
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,356 $18,370 $5,650
166,178
kWh
$1,706
-
kW-mo/yr
- - -
05 3.5248: Separate and recycle scrap metal to foundry or for sale $2,810 $500 - - $2,810
-
lb
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $960 - $960
15,533
kWh
- - - -
TOTAL RECOMMENDED $154,858 $436,375 $10,442
242,965
kWh
$1,706
-
kW-mo/yr
$2,810
-
lb
$75,400 $64,500
TOTAL IMPLEMENTED $40,310 $16,930 - - $2,810
-
lb
- $37,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs