ITAC Assessment: OK1026
ITAC logo
ITAC Assessment: OK1026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Aircraft parts and tooling
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 115,400
ft2
Annual Production 10,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $523,374 4,581,400
kWh
Natural Gas $29,440 5,468
MMBtu
TOTAL YEARLY COSTS $552,814
RECOMMENDED SAVINGS* $110,365 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $88,248

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $63,058 $31,918 $63,058
552,175
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,777 $4,050 $11,777
103,128
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,340 $8,098 $10,340
90,540
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $6,503 $1,186 $6,503
56,940
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $4,712 - $4,712
41,259
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,762 $490 $4,762
41,697
kWh
-
07 2.2437: Recover waste heat from equipment $4,974 - - $4,974
-
MMBtu
08 2.7211: Clean and maintain refrigerant condensers and towers $4,239 $795 $4,239
37,118
kWh
-
TOTAL RECOMMENDED $110,365 $46,537 $105,391
922,857
kWh
$4,974
-
MMBtu
TOTAL IMPLEMENTED $88,248 $34,389 $83,274
729,189
kWh
$4,974
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs