ITAC Assessment: AM0217
ITAC logo
ITAC Assessment: AM0217
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Snack food products (sausages, beef jerky, pig's feet, pickl
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 40,000
ft2
Annual Production 3,360,500
lb
Production Hrs. Annual 2,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $116,848 1,512,310
kWh
Natural Gas $26,841 6,356
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,707 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,047

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings
01 3.1192: Reduce scrap production $20,000 - - - - $20,000
02 3.1192: Reduce scrap production $11,688 $20 - - - $11,688
03 3.5315: Lease / purchase baler; sell cardboard to recycler $4,680 $9,025 - - $4,680 -
04 2.6231: Utilize controls to operate equipment only when needed $2,980 $1,040 $2,980
37,222
kWh
- - -
05 2.2135: Repair and eliminate steam leaks $650 $30 - $650
-
MMBtu
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $640 $250 $640
9,086
kWh
- - -
07 2.7124: Make a practice of turning off lights when not needed $308 - $308
4,396
kWh
- - -
08 2.2511: Insulate bare equipment $290 $70 - $290
-
MMBtu
- -
09 2.2136: Install / repair insulation on steam lines $200 $99 - $200
-
MMBtu
- -
10 2.7124: Make a practice of turning off lights when not needed $182 - $182
2,638
kWh
- - -
11 2.7447: Install vinyl strip / high speed / air curtain doors $89 $37 $89
1,172
kWh
- - -
TOTAL RECOMMENDED $41,707 $10,571 $4,199
54,514
kWh
$1,140
-
MMBtu
$4,680 $31,688
TOTAL IMPLEMENTED $34,047 $506 $1,219
17,292
kWh
$1,140
-
MMBtu
- $31,688
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs