ITAC Assessment: KS2542
ITAC logo
ITAC Assessment: KS2542
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Flexible Hose
NAICS 326220: Rubber and Plastics Hoses and Belting Manufacturing
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $100
M
to 500
M
# of Employees 180
Plant Area 440,000
ft2
Annual Production 250,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $467,844 6,915,480
kWh
Electricity Demand $74,997 15,119
kW-mo/yr
Natural Gas $17,171 15,660
MMBtu
Waste Disposal Costs
Water Usage $10,640 1,085
Tgal
Water Disposal $13,043 1,085
Tgal
TOTAL YEARLY COSTS $583,695
RECOMMENDED SAVINGS* $127,857 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $25,030 $29,920 $22,756
334,653
kWh
$2,274
-
kW-mo/yr
-
02 2.7232: Replace existing hvac unit with high efficiency model $49,140 $229,656 $44,676
657,000
kWh
$4,464
-
kW-mo/yr
-
03 2.8112: Combine utility meters $5,464 $22,500 - - $5,464
04 2.9114: Use solar heat to make electricty $48,223 $476,700 $42,143
619,762
kWh
$6,080
-
kW-mo/yr
-
TOTAL RECOMMENDED $127,857 $758,776 $109,575
1,611,415
kWh
$12,818
-
kW-mo/yr
$5,464
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs