ITAC Assessment: MI0005
ITAC logo
ITAC Assessment: MI0005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Electrical Diodes & Rectifiers
NAICS
n/a
SIC 3629: Electrical Industrial Apparatus, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 27,230
ft2
Annual Production 41,600,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,104 2,703,508
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $220,148 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Primary Product Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $13,307 $1,381 $13,307
190,246
kWh
-
02 3.1191: Change procedures / equipment / operating conditions $10,759 $11 $10,759
153,700
kWh
-
03 2.7111: Reduce illumination to minimum necessary levels $2,110 $423 $2,110
30,139
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,655 $3,000 $2,655
37,930
kWh
-
05 2.6124: Establish equipment maintenance schedule $149,887 $23,328 - $149,887
06 3.1191: Change procedures / equipment / operating conditions $41,430 $11,232 - $41,430
TOTAL RECOMMENDED $220,148 $39,375 $28,831
412,015
kWh
$191,317
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs