ITAC Assessment: IP0144
ITAC logo
ITAC Assessment: IP0144
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Encapsulated Shelves and Smooth Cooktops
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $50
M
to 100
M
# of Employees 238
Plant Area 327,215
ft2
Annual Production 7,586,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,031,756 27,635,900
kWh
Electricity Demand $1,022,504 48,832
kW-mo/yr
Natural Gas $48,902 9,174
MMBtu
Waste Disposal Costs
Water Usage $61,441 7,122
Tgal
TOTAL YEARLY COSTS $2,164,603
RECOMMENDED SAVINGS* $25,504 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,035

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $1,556 - $495
13,373
kWh
- $1,061
-
MMBtu
02 2.6211: Conserve energy by efficient use of vending machines $2,096 - $1,181
31,914
kWh
$915
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,747 $85 $1,747
47,212
kWh
- -
04 2.2612: Use cooling tower water instead of refrigeration $8,469 $3,263 $8,469
228,888
kWh
- -
05 2.7135: Install occupancy sensors $194 $195 $194
5,249
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $11,442 $22,030 $5,516
149,090
kWh
$5,926
-
kW-mo/yr
-
TOTAL RECOMMENDED $25,504 $25,573 $17,602
475,726
kWh
$6,841
-
kW-mo/yr
$1,061
-
MMBtu
TOTAL IMPLEMENTED $17,035 $22,310 $9,133
246,838
kWh
$6,841
-
kW-mo/yr
$1,061
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs