Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Glass container manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT1013 #06 Y:2026 Use solar heat to make electricty $1,247,178 $8,987,283
GT1013 #05 Y:2026 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $1,944,968 $7,245,000
GT1013 #04 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,053 $10,420
GT1013 #03 Y:2026 Install occupancy sensors $1,016 $2,763
GT1013 #02 Y:2026 Eliminate or reduce compressed air usage $195,666 $4,000
GT1013 #01 Y:2026 Change rate schedules or other changes in utility service $74,736 $100
OK0981 #06 Y:2017 Optimize plant power factor $11,423 $50,570
OK0981 #05 Y:2017 Install waste heat boiler to provide direct power $353,111 $2,500,000
OK0981 #04 Y:2017 Utilize higher efficiency lamps and/or ballasts $21,343 $69,050
OK0981 #03 Y:2017 Install compressor air intakes in coolest locations $16,309 $4,937
OK0981 #02 Y:2017 Reduce the pressure of compressed air to the minimum required $7,815 -
OK0981 #01 Y:2017 Upgrade controls on compressors $124,716 $75,000
DL0169 #06 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $300,500 $1,937,040
DL0169 #05 Y:2016 Insulate bare equipment $11,160 $11,160
DL0169 #04 Y:2016 Use hot process fluids to preheat incoming process fluids $5,060 $5,000
DL0169 #03 Y:2016 Adjust burners for efficient operation $117,000 $34,000
DL0169 #02 Y:2016 Keep equipment clean $13,120 $2,500
DL0169 #01 Y:2016 Use waste heat from hot flue gases to preheat incoming fluids $163,600 $12,000
MZ0145 #09 Y:2014 Use photocell controls $1,686 $2,450
MZ0145 #08 Y:2014 Lower temperature during the winter season and vice-versa $1,868 -