ITAC Assessment: DL0169
ITAC logo
ITAC Assessment: DL0169
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Glass Bottles
NAICS 327213: Glass Container Manufacturing
SIC 3221: Glass Containers
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 230,000
ft2
Annual Production 500,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $6,006,605 61,054,379
kWh
Natural Gas $3,027,745 753,405
MMBtu
TOTAL YEARLY COSTS $9,034,350
RECOMMENDED SAVINGS* $610,440 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,120

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $163,600 $12,000 - $163,600
-
MMBtu
02 2.6125: Keep equipment clean $13,120 $2,500 - $13,120
-
MMBtu
03 2.1133: Adjust burners for efficient operation $117,000 $34,000 - $117,000
-
MMBtu
04 2.2444: Use hot process fluids to preheat incoming process fluids $5,060 $5,000 - $5,060
-
MMBtu
05 2.2511: Insulate bare equipment $11,160 $11,160 - $11,160
-
MMBtu
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $300,500 $1,937,040 $300,500
3,066,000
kWh
-
TOTAL RECOMMENDED $610,440 $2,001,700 $300,500
3,066,000
kWh
$309,940
-
MMBtu
TOTAL IMPLEMENTED $13,120 $2,500 - $13,120
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs