Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

183

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Flat glass manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CI0058 #08 Y:2025 Recover waste heat from equipment $3,037 $14,840
CI0058 #07 Y:2025 Replace existing hvac unit with high efficiency model $10,295 $50,910
CI0058 #06 Y:2025 Utilize higher efficiency lamps and/or ballasts $17,177 $17,556
CI0058 #05 Y:2025 Replace fossil fuel equipment with electrical equipment $23,252 $78,000
CI0058 #04 Y:2025 Use battery storage for demand control $24,690 $40,000
CI0058 #03 Y:2025 Use photocell controls $48,465 $9,920
CI0058 #02 Y:2025 Replace existing equipment with more suitable substitutes $96,000 $50,000
CI0058 #01 Y:2025 Use solar heat to make electricty $134,698 $652,406
UL2505 #04 Y:2025 Use optimum thickness insulation $23,183 $32,000
UL2505 #03 Y:2025 Recover waste heat from equipment $14,289 $39,000
UL2505 #02 Y:2025 Use solar heat to make electricty $16,332 $130,462
UL2505 #01 Y:2025 Install occupancy sensors $188 $393
SF0634 #09 Y:2025 Use photocell controls $585 $1,248
SF0634 #08 Y:2025 Heat water with exhaust heat $9,559 $18,756
SF0634 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $6,856 $6,881
SF0634 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $9,362 $8,453
SF0634 #05 Y:2025 Recharge batteries on during off-peak demand periods $3,706 $2,070
SF0634 #04 Y:2025 Utilize controls to operate equipment only when needed $55,964 $17,866
SF0634 #03 Y:2025 Eliminate or reduce compressed air usage $25,314 $6,300
SF0634 #02 Y:2025 Turn off equipment when not in use $11,091 -