Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

781

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Glass and glass product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0679 #04 Y:2025 Eliminate or reduce compressed air usage $179 $185
WV0679 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $283 $25
WV0679 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,114 $3,943
WV0679 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,875 $900
SF0634 #09 Y:2025 Use photocell controls $585 $1,248
SF0634 #08 Y:2025 Heat water with exhaust heat $9,559 $18,756
SF0634 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $6,856 $6,881
SF0634 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $9,362 $8,453
SF0634 #05 Y:2025 Recharge batteries on during off-peak demand periods $3,706 $2,070
SF0634 #04 Y:2025 Utilize controls to operate equipment only when needed $55,964 $17,866
SF0634 #03 Y:2025 Eliminate or reduce compressed air usage $25,314 $6,300
SF0634 #02 Y:2025 Turn off equipment when not in use $11,091 -
SF0634 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $6,190 -
LE0588 #08 Y:2024 Install occupancy sensors $38 $140
LE0588 #07 Y:2024 Replace obsolete burners with more efficient ones $175,084 $635,000
LE0588 #06 Y:2024 Re-use or recycle hot or cold process exhaust air $938 $2,500
LE0588 #05 Y:2024 Replace fossil fuel equipment with electrical equipment $25,169 $56,274
LE0588 #04 Y:2024 Reschedule plant operations or reduce load to avoid peaks $13,600 $26,934
LE0588 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,412 $1,256
LE0588 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $1,235 $100