ITAC Assessment: MU0097
ITAC logo
ITAC Assessment: MU0097
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Auto Glass and Antenna
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $100
M
to 500
M
# of Employees 26
Plant Area 39,000
ft2
Annual Production 31,000,000
units
Production Hrs. Annual 2,340
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $156,421 1,100,269
kWh
Electricity Fees $10,304 -
Natural Gas $15,938 2,014
MMBtu
Other Gas $2,844 1
MMBtu
Waste Disposal Costs
Water Usage $7,223 1,354
Tgal
Water Disposal $5,663 1,354
Tgal
TOTAL YEARLY COSTS $198,392
RECOMMENDED SAVINGS* $10,183 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.8123: Pay utility bills on time $5,700 - - - $5,700
02 2.7231: Use radiant heater for spot heating $1,918 $1,989 - $1,918
-
MMBtu
-
03 2.2136: Install / repair insulation on steam lines $602 $1,733 $602
4,237
kWh
- -
04 2.2449: Recover heat from exhausted steam, hot air or hot water $1,173 $754 - $1,173
-
MMBtu
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $659 - $659
4,641
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $130 $80 $130
917
kWh
- -
TOTAL RECOMMENDED $10,183 $4,556 $1,391
9,795
kWh
$3,092
-
MMBtu
$5,700
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs