ITAC Assessment: MZ0124
ITAC logo
ITAC Assessment: MZ0124
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product automotive braking systems
NAICS 336340: Motor Vehicle Brake System Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 270
Plant Area 110,000
ft2
Annual Production 2,374,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,204 2,554,942
kWh
Electricity Demand $56,907 7,732
kW-mo/yr
Natural Gas $20,391 2,043
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,522 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,016

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,890 $900 $3,127
53,914
kWh
$763
-
kW-mo/yr
-
02 2.2437: Recover waste heat from equipment $10,497 $15,000 - - $10,497
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,319 - $3,319
55,498
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $18,532 $45,540 $14,985
250,585
kWh
$3,547
-
kW-mo/yr
-
05 2.7229: Air condition only space necessary $32,690 $12,531 $24,361
407,376
kWh
$8,329
-
kW-mo/yr
-
06 2.4227: Use compressor air filters $1,594 $850 $1,289
21,556
kWh
$305
-
kW-mo/yr
-
TOTAL RECOMMENDED $70,522 $74,821 $47,081
788,929
kWh
$12,944
-
kW-mo/yr
$10,497
-
MMBtu
TOTAL IMPLEMENTED $24,016 $47,290 $19,401
326,055
kWh
$4,615
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs