53
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NC0609 #06 Y:2017 | 06 | 2017 | Develop a repair/replace policy | $1,705 | $5,685 | |
| NC0609 #05 Y:2017 | 05 | 2017 | Reduce the pressure of compressed air to the minimum required | $1,341 | $2,500 | |
| NC0609 #04 Y:2017 | 04 | 2017 | Eliminate leaks in inert gas and compressed air lines/ valves | $650 | $200 | |
| NC0609 #03 Y:2017 | 03 | 2017 | Install occupancy sensors | $173 | $350 | |
| NC0609 #02 Y:2017 | 02 | 2017 | Utilize higher efficiency lamps and/or ballasts | $1,593 | $8,972 | |
| NC0609 #01 Y:2017 | 01 | 2017 | Replace high resistance ducts, pipes, and fittings | $9,405 | - | |
| NC0410 #05 Y:2010 | 05 | 2010 | Utilize higher efficiency lamps and/or ballasts | $118 | $435 | |
| NC0410 #04 Y:2010 | 04 | 2010 | Utilize higher efficiency lamps and/or ballasts | $1,167 | $3,040 | |
| NC0410 #03 Y:2010 | 03 | 2010 | Develop a repair/replace policy | $569 | $580 | |
| NC0410 #02 Y:2010 | 02 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,826 | $100 | |
| NC0410 #01 Y:2010 | 01 | 2010 | Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $101,033 | $272,411 | |
| NC0393 #05 Y:2009 | 05 | 2009 | Utilize higher efficiency lamps and/or ballasts | $967 | $2,795 | |
| NC0393 #04 Y:2009 | 04 | 2009 | Eliminate leaks in inert gas and compressed air lines/ valves | $256 | $100 | |
| NC0393 #03 Y:2009 | 03 | 2009 | Recycle air for heating, ventilation and air conditioning | $6,020 | $2,216 | |
| NC0393 #02 Y:2009 | 02 | 2009 | Reschedule plant operations or reduce load to avoid peaks | $31,650 | $1,000 | |
| NC0393 #01 Y:2009 | 01 | 2009 | Utilize a less expensive cooling method | $32,824 | $74,000 | |
| NC0343 #08 Y:2006 | 08 | 2006 | Utilize higher efficiency lamps and/or ballasts | $312 | $424 | |
| NC0343 #07 Y:2006 | 07 | 2006 | Install sensors to detect defects | $1,350,000 | $800,000 | |
| NC0343 #06 Y:2006 | 06 | 2006 | Replace electrically-operated equipment with fossil fuel equipment | $2,384 | $3,000 | |
| NC0343 #05 Y:2006 | 05 | 2006 | Use adjustable frequency drive or multiple speed motors on existing system | $76,598 | $14,000 |