ITAC Assessment: NC0343
ITAC logo
ITAC Assessment: NC0343
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Aplite
NAICS 327992: Ground or Treated Mineral and Earth Manufacturing
SIC 3299: Nonmetallic Mineral Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 31
Plant Area 50,000
ft2
Annual Production 420,000,000
lb
Production Hrs. Annual 8,600
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $643,617 9,792,838
kWh
Electricity Demand $57,086 18,796
kW-mo/yr
Electricity Fees $18,803 -
Fuel Oil #4 $780,780 74,256
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,712,535 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #4 Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
01 2.2424: Use heat in flue gases to preheat products or materials $137,000 $28,000 - - $137,000
-
MMBtu
- - -
02 2.5194: Redesign process $54,257 $30,000 $(-53,077.0)
(-789,840)
kWh
$(-1,975.0)
-
kW-mo/yr
$109,309
-
MMBtu
- - -
03 2.3192: Use fossil fuel powered generator during peak demand periods $73,265 $260,000 - $22,425
-
kW-mo/yr
- $51,840 $(-1,000.0) -
04 2.4131: Size electric motors for peak operating efficiency $18,719 $10,000 $18,047
268,560
kWh
$672
-
kW-mo/yr
- - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $76,598 $14,000 $14,324
213,152
kWh
$533
-
kW-mo/yr
$61,741
-
MMBtu
- - -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,384 $3,000 $5,410
80,500
kWh
$263
-
kW-mo/yr
$(-3,289.0)
-
MMBtu
- - -
07 4.126: Install sensors to detect defects $1,350,000 $800,000 - - - - - $1,350,000
08 2.7142: Utilize higher efficiency lamps and/or ballasts $312 $424 $301
4,474
kWh
$11
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $1,712,535 $1,145,424 $(-14,995.0)
(-223,154)
kWh
$21,929
-
kW-mo/yr
$304,761
-
MMBtu
$51,840 $(-1,000.0) $1,350,000
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #4 Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs