Assessment Year | 2018 |
---|---|
Principal Product | Steel shot |
NAICS | 327910: Abrasive Product Manufacturing |
SIC | 3291: Abrasive Products |
Sales Range | $50 M to 100M |
# of Employees | 45 |
Plant Area |
60,000
ft2
|
Annual Production | 88,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,130,621 | 29,379,329 |
kWh
|
$0.038 |
Electricity Demand | $235,800 | 95,504 |
kW-mo/yr
|
$2.47 |
Electricity Fees | $21,701 | - |
|
- |
LPG | $538,052 | 62,298 |
MMBtu
|
$8.64 |
TOTAL YEARLY COSTS | $1,926,174 | |||
RECOMMENDED SAVINGS* | $14,867 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,289 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.5122: Replace high resistance ducts, pipes, and fittings | $9,405 | - |
$6,791
176,400
kWh
|
$2,614
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,593 | $8,972 |
$1,036
26,906
kWh
|
$191
-
kW-mo/yr
|
- | $366 | |
03 | 2.7135: Install occupancy sensors | $173 | $350 |
$173
4,489
kWh
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $650 | $200 |
$753
19,560
kWh
|
$97
-
kW-mo/yr
|
$(-100.0) | $(-100.0) | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,341 | $2,500 |
$1,188
30,863
kWh
|
$153
-
kW-mo/yr
|
- | - | |
06 | 2.4151: Develop a repair/replace policy | $1,705 | $5,685 |
$1,511
39,257
kWh
|
$194
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $14,867 | $17,707 |
$11,452
297,475
kWh
|
$3,249
-
kW-mo/yr
|
$(-100.0) | $266 | ||
TOTAL IMPLEMENTED | $5,289 | $17,357 |
$4,488
116,586
kWh
|
$635
-
kW-mo/yr
|
$(-100.0) | $266 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs