ITAC Assessment: NC0609
ITAC logo
ITAC Assessment: NC0609
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Steel shot
NAICS 327910: Abrasive Product Manufacturing
SIC 3291: Abrasive Products
Sales Range $50
M
to 100
M
# of Employees 45
Plant Area 60,000
ft2
Annual Production 88,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,130,621 29,379,329
kWh
Electricity Demand $235,800 95,504
kW-mo/yr
Electricity Fees $21,701 -
LPG $538,052 62,298
MMBtu
TOTAL YEARLY COSTS $1,926,174
RECOMMENDED SAVINGS* $14,867 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,289

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.5122: Replace high resistance ducts, pipes, and fittings $9,405 - $6,791
176,400
kWh
$2,614
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,593 $8,972 $1,036
26,906
kWh
$191
-
kW-mo/yr
- $366
03 2.7135: Install occupancy sensors $173 $350 $173
4,489
kWh
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $650 $200 $753
19,560
kWh
$97
-
kW-mo/yr
$(-100.0) $(-100.0)
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,341 $2,500 $1,188
30,863
kWh
$153
-
kW-mo/yr
- -
06 2.4151: Develop a repair/replace policy $1,705 $5,685 $1,511
39,257
kWh
$194
-
kW-mo/yr
- -
TOTAL RECOMMENDED $14,867 $17,707 $11,452
297,475
kWh
$3,249
-
kW-mo/yr
$(-100.0) $266
TOTAL IMPLEMENTED $5,289 $17,357 $4,488
116,586
kWh
$635
-
kW-mo/yr
$(-100.0) $266