Assessment Year | 1991 |
---|---|
Principal Product | INJECTION MOLDED PRODUCT |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
n/a
|
Annual Production | 2,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $209,731 | 4,072,978 |
kWh
|
$0.051 |
Natural Gas | $4,978 | 982 |
MMBtu
|
$5.07 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,267 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,267 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,221 | - |
$3,046
59,203
kWh
|
- | $(-1,825.0) | |
02 | 2.7442: Keep doors and windows shut when not on use | $1,750 | $1,050 |
$1,750
33,998
kWh
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $390 | $200 |
$390
7,620
kWh
|
- | - | |
04 | 2.7261: Install timers and/or thermostats | $721 | $750 |
$194
7,913
kWh
|
$527
-
MMBtu
|
- | |
05 | 2.2437: Recover waste heat from equipment | $400 | $450 | - |
$400
-
MMBtu
|
- | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $800 | $1,730 |
$800
15,533
kWh
|
- | - | |
07 | 2.3311: Replace dc equipment with ac equipment | $1,600 | $3,200 |
$1,600
-
kWh
|
- | - | |
08 | 2.2511: Insulate bare equipment | $1,715 | $3,130 |
$1,715
14,947
kWh
|
- | - | |
09 | 2.7243: Improve air circulation with destratification fans / other methods | $670 | $1,600 |
$(-90.0)
(-1,758)
kWh
|
$760
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $9,267 | $12,110 |
$9,405
137,456
kWh
|
$1,687
-
MMBtu
|
$(-1,825.0) | ||
TOTAL IMPLEMENTED | $9,267 | $12,110 |
$9,405
137,456
kWh
|
$1,687
-
MMBtu
|
$(-1,825.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs