Assessment Year | 2022 |
---|---|
Principal Product | Oil & gas field equipment |
NAICS | 333132: Oil and Gas Field Machinery and Equipment Manufacturing |
SIC | 3533: Oil and Gas Field Machinery and Equipment |
Sales Range | $50 M to 100M |
# of Employees | 499 |
Plant Area |
400,000
ft2
|
Annual Production | 387,000
lb
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $572,270 | 13,308,605 |
kWh
|
$0.043 | |
Electricity Demand | $985,076 | 74,797 |
kW-mo/yr
|
$13.17 | |
Electricity Fees | $163,887 | - |
|
- | |
Natural Gas | $51,557 | 9,934 |
MMBtu
|
$5.19 | |
Waste Disposal Costs | |||||
Water Usage | $7,232 | 1,081 |
Tgal
|
$6.69 | |
TOTAL YEARLY COSTS | $1,780,022 | ||||
RECOMMENDED SAVINGS* | $16,513 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $12,122 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,103 | - |
$3,103
72,153
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,141 | $1,208 |
$2,141
49,795
kWh
|
- | - | |
03 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $5,553 | $3,192 | - | - |
$5,553
-
MMBtu
|
|
04 | 2.7232: Replace existing hvac unit with high efficiency model | $3,561 | $18,463 |
$2,165
50,358
kWh
|
$1,396
-
kW-mo/yr
|
- | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $830 | - | - | - |
$830
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,325 | $5,412 |
$551
12,823
kWh
|
$774
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $16,513 | $28,275 |
$7,960
185,129
kWh
|
$2,170
-
kW-mo/yr
|
$6,383
-
MMBtu
|
||
TOTAL IMPLEMENTED | $12,122 | $9,812 |
$5,795
134,771
kWh
|
$774
-
kW-mo/yr
|
$5,553
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs