Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

69

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Nonmetallic mineral product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT1013 #06 Y:2026 Use solar heat to make electricty $1,247,178 $8,987,283
GT1013 #05 Y:2026 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $1,944,968 $7,245,000
GT1013 #04 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,053 $10,420
GT1013 #03 Y:2026 Install occupancy sensors $1,016 $2,763
GT1013 #02 Y:2026 Eliminate or reduce compressed air usage $195,666 $4,000
GT1013 #01 Y:2026 Change rate schedules or other changes in utility service $74,736 $100
GT1008 #05 Y:2026 Use solar heat to make electricty $747,721 $6,224,188
GT1008 #04 Y:2026 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $1,225,825 $6,037,500
GT1008 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $8,235 $28,000
GT1008 #02 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $17,753 $35,000
GT1008 #01 Y:2026 Utilize energy-efficient belts and other improved mechanisms $3,187 $2,888
GT0927 #06 Y:2019 Use solar heat to make electricty $62,369 $548,847
GT0927 #05 Y:2019 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $308,141 $1,725,000
GT0927 #04 Y:2019 Insulate bare equipment $5,352 $6,398
GT0927 #03 Y:2019 Utilize higher efficiency lamps and/or ballasts $35,382 $27,983
GT0927 #02 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $7,930 $2,500
GT0927 #01 Y:2019 Install occupancy sensors $32,534 $4,145
GT0922 #05 Y:2019 Pay bills on time to avoid late fees $281 $1,190
GT0922 #04 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $76,284 $79,761
GT0922 #03 Y:2019 Reduce the pressure of compressed air to the minimum required $9,604 $3,500