ITAC Assessment: GT1008
ITAC logo
ITAC Assessment: GT1008
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Hydrous and Calcine Kaolin Products
NAICS 327992: Ground or Treated Mineral and Earth Manufacturing
SIC 3295: Minerals and Earths, Ground or Otherwise Treated
Sales Range $50
M
to 100
M
# of Employees 80
Plant Area 1,000,000
ft2
Annual Production 92,075
ton
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,114,572 42,237,303
kWh
Electricity Fees $11,350 -
Natural Gas $1,953,766 386,923
MMBtu
TOTAL YEARLY COSTS $5,079,688
RECOMMENDED SAVINGS* $2,002,721 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,187 $2,888 $3,187
43,063
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,753 $35,000 $17,753
239,907
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,235 $28,000 $8,235
111,288
kWh
-
04 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $1,225,825 $6,037,500 $1,620,600
21,900,000
kWh
$(-394,775.0)
-
MMBtu
05 2.9114: Use solar heat to make electricty $747,721 $6,224,188 $747,721
10,139,984
kWh
-
TOTAL RECOMMENDED $2,002,721 $12,327,576 $2,397,496
32,434,242
kWh
$(-394,775.0)
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs