| Assessment Year | 2026 |
|---|---|
| Principal Product | Hydrous and Calcine Kaolin Products |
| NAICS | 327992: Ground or Treated Mineral and Earth Manufacturing |
| SIC | 3295: Minerals and Earths, Ground or Otherwise Treated |
| Sales Range | $50 M to 100M |
| # of Employees | 80 |
| Plant Area |
1,000,000
ft2
|
| Annual Production | 92,075
ton
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $3,114,572 | 42,237,303 |
kWh
|
$0.074 |
| Natural Gas | $1,953,766 | 386,923 |
MMBtu
|
$5.05 |
| TOTAL YEARLY COSTS | $5,068,338 | |||
| RECOMMENDED SAVINGS* | $2,004,862 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,141 | $1,850 |
$5,041
68,119
kWh
|
- | $(-2,900.0) | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,187 | $2,888 |
$3,187
43,063
kWh
|
- | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $17,753 | $35,000 |
$17,753
239,907
kWh
|
- | - | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,235 | $28,000 |
$8,235
111,288
kWh
|
- | - | |
| 05 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $1,225,825 | $6,037,500 |
$1,620,600
21,900,000
kWh
|
$(-394,775.0)
-
MMBtu
|
- | |
| 06 | 2.9114: Use solar heat to make electricty | $747,721 | $6,224,188 |
$747,721
10,139,984
kWh
|
- | - | |
| TOTAL RECOMMENDED | $2,004,862 | $12,329,426 |
$2,402,537
32,502,361
kWh
|
$(-394,775.0)
-
MMBtu
|
$(-2,900.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs