| Assessment Year | 2006 |
|---|---|
| Principal Product | classified corn cob particles |
| NAICS | 311211: Flour Milling |
| SIC | 2041: Flour and Other Grain Mill Products |
| Sales Range | $5 M to 10M |
| # of Employees | 26 |
| Plant Area |
239,580
ft2
|
| Annual Production | 25,000
ton
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $262,292 | 5,127,287 |
kWh
|
$0.051 |
| Electricity Demand | $87,891 | 13,236 |
kW-mo/yr
|
$6.64 |
| Electricity Fees | $336 | - |
|
- |
| Natural Gas | $13,405 | 1,371 |
MMBtu
|
$9.78 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $12,000 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,937 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,454 | $200 |
$2,070
40,320
kWh
|
$384
-
kW-mo/yr
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,970 | $1,000 |
$4,196
81,480
kWh
|
$774
-
kW-mo/yr
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $710 | $735 |
$600
11,643
kWh
|
$110
-
kW-mo/yr
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,056 | $1,826 |
$890
17,260
kWh
|
$166
-
kW-mo/yr
|
- | |
| 05 | 2.7135: Install occupancy sensors | $1,278 | $924 |
$1,278
24,808
kWh
|
- | - | |
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $747 | $1,000 | - | - |
$747
-
MMBtu
|
|
| 07 | 2.2136: Install / repair insulation on steam lines | $785 | $990 | - | - |
$785
-
MMBtu
|
|
| TOTAL RECOMMENDED | $12,000 | $6,675 |
$9,034
175,511
kWh
|
$1,434
-
kW-mo/yr
|
$1,532
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $9,937 | $4,761 |
$7,756
150,703
kWh
|
$1,434
-
kW-mo/yr
|
$747
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs