ITAC Assessment: GT0922
ITAC logo
ITAC Assessment: GT0922
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Calcium Carbonate Products
NAICS 327991: Cut Stone and Stone Product Manufacturing
SIC 3281: Cut Stone and Stone Products
Sales Range $50
M
to 100
M
# of Employees 107
Plant Area 1,000,000
ft2
Annual Production 533,515
units
Production Hrs. Annual 8,736
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,234,154 30,627,121
kWh
Natural Gas $104,050 28,108
MMBtu
TOTAL YEARLY COSTS $2,338,204
RECOMMENDED SAVINGS* $101,078 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $101,078

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.4313: Provide proper maintenance of motor driven equipment $8,082 $1,200 $8,082
110,707
kWh
- -
02 2.2511: Insulate bare equipment $6,827 $1,175 - - $6,827
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $9,604 $3,500 $9,604
131,564
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $76,284 $79,761 $76,284
1,044,988
kWh
- -
05 4.821: Pay bills on time to avoid late fees $281 $1,190 - $281 -
TOTAL RECOMMENDED $101,078 $86,826 $93,970
1,287,259
kWh
$281 $6,827
-
MMBtu
TOTAL IMPLEMENTED $101,078 $86,826 $93,970
1,287,259
kWh
$281 $6,827
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs