Assessment Year | 2019 |
---|---|
Principal Product | Calcium Carbonate Products |
NAICS | 327991: Cut Stone and Stone Product Manufacturing |
SIC | 3281: Cut Stone and Stone Products |
Sales Range | $50 M to 100M |
# of Employees | 107 |
Plant Area |
1,000,000
ft2
|
Annual Production | 533,515
units
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,234,154 | 30,627,121 |
kWh
|
$0.073 |
Natural Gas | $104,050 | 28,108 |
MMBtu
|
$3.70 |
TOTAL YEARLY COSTS | $2,338,204 | |||
RECOMMENDED SAVINGS* | $101,078 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $101,078 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4313: Provide proper maintenance of motor driven equipment | $8,082 | $1,200 |
$8,082
110,707
kWh
|
- | - | |
02 | 2.2511: Insulate bare equipment | $6,827 | $1,175 | - | - |
$6,827
-
MMBtu
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,604 | $3,500 |
$9,604
131,564
kWh
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $76,284 | $79,761 |
$76,284
1,044,988
kWh
|
- | - | |
05 | 4.821: Pay bills on time to avoid late fees | $281 | $1,190 | - | $281 | - | |
TOTAL RECOMMENDED | $101,078 | $86,826 |
$93,970
1,287,259
kWh
|
$281 |
$6,827
-
MMBtu
|
||
TOTAL IMPLEMENTED | $101,078 | $86,826 |
$93,970
1,287,259
kWh
|
$281 |
$6,827
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs