Assessment Year | 1990 |
---|---|
Principal Product | FLUID MILK,CHEESE,CREAM |
NAICS |
n/a
|
SIC | 2026: Fluid Milk |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
n/a
|
Annual Production | 100,000,000
lb
|
Production Hrs. Annual | 2,860
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $227,705 | 4,919,109 |
kWh
|
$0.046 |
Natural Gas | $144,394 | 33,288 |
MMBtu
|
$4.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,603 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,167 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2447: Heat water with exhaust heat | $9,236 | $16,000 | - |
$9,236
-
MMBtu
|
- | |
02 | 2.4133: Use most efficient type of electric motors | $2,367 | $1,042 |
$2,367
51,290
kWh
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,400 | $6,000 |
$4,400
94,373
kWh
|
- | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,600 | $2,000 | - |
$8,600
-
MMBtu
|
- | |
05 | 2.2152: Maintain steam jets used for vacuum system | $4,700 | $1,600 | - | - | $4,700 | |
06 | 2.4239: Eliminate or reduce compressed air usage | $1,800 | $6,000 |
$1,800
88,511
kWh
|
- | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,400 | $5,000 |
$2,400
52,755
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $100 | $283 |
$100
2,345
kWh
|
- | - | |
TOTAL RECOMMENDED | $33,603 | $37,925 |
$11,067
289,274
kWh
|
$17,836
-
MMBtu
|
$4,700 | ||
TOTAL IMPLEMENTED | $20,167 | $10,925 |
$6,867
148,008
kWh
|
$8,600
-
MMBtu
|
$4,700 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs