| Assessment Year | 1990 |
|---|---|
| Principal Product | FLUID MILK,CHEESE,CREAM |
| NAICS |
n/a
|
| SIC | 2026: Fluid Milk |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
n/a
|
| Annual Production | 100,000,000
lb
|
| Production Hrs. Annual | 2,860
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $227,705 | 4,919,109 |
kWh
|
$0.046 |
| Natural Gas | $144,394 | 33,288 |
MMBtu
|
$4.34 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $33,603 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $20,167 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2447: Heat water with exhaust heat | $9,236 | $16,000 | - |
$9,236
-
MMBtu
|
- | |
| 02 | 2.4133: Use most efficient type of electric motors | $2,367 | $1,042 |
$2,367
51,290
kWh
|
- | - | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,400 | $6,000 |
$4,400
94,373
kWh
|
- | - | |
| 04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,600 | $2,000 | - |
$8,600
-
MMBtu
|
- | |
| 05 | 2.2152: Maintain steam jets used for vacuum system | $4,700 | $1,600 | - | - | $4,700 | |
| 06 | 2.4239: Eliminate or reduce compressed air usage | $1,800 | $6,000 |
$1,800
88,511
kWh
|
- | - | |
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,400 | $5,000 |
$2,400
52,755
kWh
|
- | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $100 | $283 |
$100
2,345
kWh
|
- | - | |
| TOTAL RECOMMENDED | $33,603 | $37,925 |
$11,067
289,274
kWh
|
$17,836
-
MMBtu
|
$4,700 | ||
| TOTAL IMPLEMENTED | $20,167 | $10,925 |
$6,867
148,008
kWh
|
$8,600
-
MMBtu
|
$4,700 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs